Illustration: rows of machined steel waves that grow taller from left to right, lit blue on the left and red on the right.

How it works

From the first check to the final review.

Work with business records tends to follow the same path: understand what was supplied, check it, calculate the result, handle corrections and prepare it for review. Our software is designed to carry each step in order and show what still needs attention.

The steps

The same order, every time.

Each result keeps its inputs and history. A reviewer can see what was supplied, what changed and what is still open.

  1. 01UnderstandIdentify what each supplied figure represents, with its source, units and time.In the Harbor testBefore-and-after weight figures for one vessel.
  2. 02CheckConfirm the required information is present and flag inputs that disagree.In the Harbor testA missing weight and an unclear unit were rejected.
  3. 03CalculateApply the calculation the task calls for.In the Harbor test1,100 tonnes unloaded.
  4. 04CorrectRecalculate when a figure changes and keep the earlier result.In the Harbor testOne figure corrected: 1,200 tonnes. The first report was kept.
  5. 05ReviewPrepare the result and any open issues for a specialist.In the Harbor testThe result waited for a person to review it.

The Harbor test used sample figures, not a real cargo operation.

Records first

Built on the records you already keep.

Today, Harbor’s survey software accepts survey figures in a set format. Working directly from older spreadsheets, databases and reports is our development direction.

What works today

Built and tested in Project Harbor.

Harbor’s survey software follows these steps for survey figures supplied in its set format. In a test with sample figures, it calculated how much cargo moved and flagged figures that conflicted with the stated operation. It rejected a missing weight and an unclear unit. When a figure was corrected, it recalculated the result and kept the earlier report.

Sample figures in a software test: not a real cargo operation, a field result or a measure of time saved.

We also ran the Harbor simulation from an empty barge to the final survey and watched it through. The survey software stored each crane load and worked out the cargo from the barge’s drafts.

From a simulation run we watched · 10 November 2026

survey-20261111T044556-25C296BC

Crane loads
12 of 12each with its six steps recorded: 72 step records
Six survey phases
Completefrom the first reading to the final survey
Cargo, from the drafts
224.69 tworked out by the survey software from the barge’s depth in the water
Cargo the crane delivered
224.68 tthe simulation’s own count: a difference of 0.7 kg

A check of the survey software against a computer simulation of the harbour. It is not a field measurement, an accuracy claim at sea or a measure of time saved. See the captures and the full record

Collaborate

Bring the work your team repeats.